last real days where i can make wholesale changes to our stack, apps, and multiple interfaces without having to worry about customers being live. it’s going very well. should have everything in place by the end of today, and be knees deep in app debugging.
feels good though. hard launch date set for no later than 2/24/26. goal is to have one each from the major categories ready to drop on that day:
- restaurant — live via HPC (Crimson?)
- bar — live HPC (big dean’s?)
- food court — live or demo (sort of covered by gaming tables in HPC) there’s on on main street in Santa Monica?
- casino — live HPC
- hotel — live or demo (likely referral from HPC)
- motel — live with SP-SM: Service Point Sharing & Monetization om on some functional level
- hospital — optional / pilot (potential referral, if not i can get this easy)
- small stadium venue – high school or that level (same as hospital, i can get)
i can make that happen, having HPC plus their referrals will be optimal.
we finally have a proper god mode in place, along with custom built monitoring of our api endpoints. full server stack is live and monitored. git properly organized and pushing properly on its own. finaly doing a major fix to quell all the different normalization/casing errors that were constantly fucking things up. probably 60% of our errors, at least, eliminated by a single codebase change. and finally able to make such a change because our server environment is stable.
payfrit is closer than it’s ever been.
Leave a Reply